From Dev.to
Category 2 IBR registration: which NERC standards apply, and why CIP isn't one of them yet
For years, NERC registration was a question for large plants. A solar, wind or storage project of 75 MVA or less, or connected below 100 kV, usually sat outside the Bulk Electric System and outside th...
